Rehabilitation – RIE

Rehab of paris HQ for b braun medical

Boulogne billancourt

Taking advantage of the need to completely refurbish their 1970’s headquarter building, B Braun Medical apply the company Europe wide work philosophy ‘New Ways of Working’ to therefit: zero paper, landscaped office space, nomadic workstation, informal relaxed working lounges. The general refurbishment works include:

• complete refit of kitchen and staff canteen

• fire regulation conformity works

• new computer room•total re-cabling power and IT

• installation of air conditioning

• façade renovation

• space planning and office furniture renewal

 

The project is phased to allow the company to continue to function without interruption throughout the works period.

About

Client

B.Braun Medical SAS

Project management

ACTEBA

Design team

Studio Mellor-Ribet (MRN) and B+C Architectes

Engineering

BPA Ingénierie SA

QS

Davis Langdon Economistes

Structural Engineering

Terrell Rooke

 

Kitchen consultant

M. Gaury

Budget

4.25 million euros

Mission

Full Scope of Works

Surface

6200 sqm

 

Handover

July 2003